digitalplan-en:approval-en
16 Approval of models and drawings
All models and drawings must be checked and approved before delivery as described in the project's PDP and requirements for self-inspection. This must appear in the delivery.
The delivery is accepted by the recipient before these are considered delivered.
digitalplan-en/approval-en.txt · Sist endret: 2022/01/18 08:27 av stun