fag:felles:fagkoder-en
Forskjeller
Her vises forskjeller mellom den valgte versjonen og den nåværende versjonen av dokumentet.
Begge sider forrige revisjonForrige revisjonNeste revisjon | Forrige revisjon | ||
fag:felles:fagkoder-en [2022/01/06 13:41] – [6.4. Modeller] stun | fag:felles:fagkoder-en [2022/01/06 13:53] (nåværende versjon) – [Final documentation] stun | ||
---|---|---|---|
Linje 171: | Linje 171: | ||
Agreed with the document manager | Agreed with the document manager | ||
- | ===== 6.5 Modellstruktur===== | + | ===== Model structure |
- | For større | + | For larger |
{{: | {{: | ||
- | Figur 3: Modellstruktur | + | Figure |
- | Leveransehyppighet og detaljrikdom kan variere fra prosjekt til prosjekt. | + | Delivery frequency and richness of detail can vary from project to project. |
+ | ==== Revisions ==== | ||
- | ==== Revisjoner ==== | + | The revision number of a document or drawing is a sequential number that increases by 1 each time a new revision of the document / drawing is officially published. For official releases (revisions), |
+ | It is a requirement that the counter in the revision number increases for each release. This means that there should be no more variants of the same number (00C, 00D, 00U etc.) of a document or a drawing. There shall be no gaps in the revision series for a document or drawing. | ||
+ | All official publications shall be treated as revisions and are thus covered by the rules of this procedure. The revision number should always start at 00 (first release), then the counter should continuously increase for each release. An official revision must always be combined with the release status (see table below). | ||
- | Revisjonsnummeret for et dokument eller en tegning er et sekvensielt nummer som øker med 1 for hver gang en ny revisjon av dokumentet/ | ||
- | Det er et krav at telleren i revisjonsnummeret øker for hver utgivelse. Det betyr at det ikke skal forekomme flere varianter av samme nummer (00C, 00D, 00U etc.) av et dokument eller en tegning. Det skal ikke forekomme hull i revisjonsserien for et dokument eller en tegning. | ||
- | Alle offisielle utgivelser skal håndteres som revisjoner og omfattes dermed av reglene i denne prosedyren. Revisjonsnummeret skal alltid starte på 00 (første utgivelse), deretter skal telleren fortløpende øke for hver utgivelse. En offisiell revisjon skal alltid kombineres med utgivelsesstatus (se tabell nedenfor). | ||
+ | ^ Revision letter ^ Description | Example | | ||
+ | | A | ** Concept / solution proposal ** In the event of changes, the serial number is increased. In the field «The revision applies», only the following must be stated: Concept / solution proposal and any short description of the change from the previous revision. | 00A, 01A, ...... | | ||
+ | | B | ** Tender basis ** B-revision shall be used in the preparation of tender drawings / documents. In the event of changes, the audit' | ||
+ | | C | ** Working document / drawing ** C-revision shall be used on drawings and documents issued for construction and installation. In the event of changes after this, the serial number (05C, 06C, etc.) is increased. | 04C, 05C, ..... | | ||
+ | | D | ** As built ** D-revision shall be used on drawings and documents issued after construction and installation. In the event of changes after this, increase the serial number (07D, 08D, etc.) \\ In the field «Revision applies», only: «As built» and any short description of change from the previous revision. | 06D, 07D, ..... | | ||
+ | | E | ** System documentation and / or documentation of a general nature ** E-audit shall be used for general / generic documentation (management system, project manuals, organization charts, system documentation / product documentation, | ||
+ | | U | ** Deleted ** Documents / drawings that have previously been published and that are to be deleted are affixed to the next serial number and status U-expired- on the document itself (09U, 10U, etc.). A U-revision must thus be treated in the same way as other publications. appear: Expired and any brief description of the change from the previous revision. | 08U | | ||
- | ^ Revisjons-bokstav | + | Table 6: Release |
- | | A | **Konsept / løsningsforslag** | + | |
- | | B | **Tilbudsgrunnlag.** B-revisjon skal benyttes ved utarbeidelse av tilbudstegninger/ | + | |
- | | C | **Arbeidsdokument/ | + | |
- | | D | **Som bygget** D-revisjon skal benyttes på tegninger og dokumenter som utgis etter bygging og installasjon. Ved endringer etter dette økes løpenummeret (07D, 08D osv.)\\ I feltet «Revisjonen gjelder» skal det kun fremgå: «Som bygget» og eventuell kort beskrivelse av endring fra forrige revisjon. | + | |
- | | E | **Systemdokumentasjon og/eller dokumentasjons av generell karakter** E-revisjon skal benyttes for generell/ | + | |
- | | U | **Utgår** Dokumenter / tegninger som tidligere er utgitt og som skal utgå påføres neste løpenummer og status | + | |
+ | The figure below shows how the letters are typically used in different project phases. The number of revisions per phase may vary. | ||
- | Tabell 6: Utgivelsesstatus | + | ^ ^ Study ^ Master plan ^ Detailed plan / tender basis ^ Construction plan / production ^ Final phase / handover ^ |
+ | | Generic documentation (not phase dependent) | 00E | 01E | 02E | 03E | 04E | | ||
+ | | Cross-phase documentation 00A | 01a | 02B 03B | 04C 05C | 06D | | ||
- | Figuren nedenfor viser hvordan bokstavene typisk benyttes i ulike prosjektfaser. Antallet revisjoner per fase kan variere. | ||
- | ^ ^ Utredning | + | Figure |
- | | Generisk dokumentasjon (ikke faseavhengig) | + | ==== Final documentation |
- | | Faseoverskridende dokumentasjon | + | Upon completion of the project, all are documented and archived as building drawings according to [[https:// |
- | + | The documentation will then have a new documentation number with a professional code for documentation and a new drawing number in the title field. | |
- | + | ||
- | Figur 4: Eks Revisjonskoding | + | |
- | + | ||
- | ==== Sluttdokumentasjon==== | + | |
- | Ved sluttføring av prosjektet dokumenteres og arkiveres alle som bygget-tegninger etter **{{ :digitalplan: | + | |
- | Dokumentasjonen får da påført et nytt dokumentasjonsnummer med fagkode | + | |
fag/felles/fagkoder-en.1641476492.txt.gz · Sist endret: 2022/01/06 13:41 av stun